Aluminium Formwork for Construction
Product Description
Aluminium Formwork for Construction
Construction cycle is short, high efficiency : Aluminum template formwork system for the fastform removal system, generally 14-40 hours to form removal, so only one layer of aluminumtemplates plus three single support can be used, a layer of the normal construction of up to 3-5days, thus greatly shorten the construction period, the construction units to saveadministrative costs, as well as real estate developers to shorten the development cycle .
Aluminium Formwork for Construction feature:
a. Easy to Handle
b. One-time Pouring
c. High Concrete Pouring Rate
d. Great Recyclable Value
e. Reduce Environmental Pollution
Aluminium Formwork for Construction technical information:
a.Wind resistance: Grade 11(wind speed≤111.5km/h)
b.Earthquake resistance: Grade 7
c.Live load capacity of roofing: 0.5kn/m2
d.External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
e.Second floor load capacity: 150 kg/m2
f. Live load of corridor is 2.0kn/ m2
1. Material: Aluminum Alloy 6063, 6063A, 6060, 6061
2. Temper available: T4, T5, T52, T6, etc.
3. Surface available: Mill finish, Anodized, Powder Coating, Wooden transfering, electrophoresis, heat insulation, PVDF, and deep processing
4.Main Components: Beam ,Column,Wall , Prop ,and others
5. Certificate: ISO9001, ISO14001
Product Show
Our Advantages:
1.We have 76 sets of extrusion line which can guarantee yearly 350,000 tons extrusion capacity.
2. 16 years professional experience in research, manufacturing and marketing.
3. Strict quality assurance and inspection measures will never let any impction measures will never let any imperfect products be out of our company
4. Stong R&D team and over 170 national patents
5. Design according to the customers' requirements.
6. Good after sale service.
Extrusion Lines
Product Categories : Aluminium Profile > Industry Aluminium Profile
Premium Related Products